Renaissance Hotel
PROJECT LOCATION Renaissance Hotel PROJECT BACKGROUND 673 bedrooms, foyer area and the entire external windows approximately 7500 liner meters.
|PROJECT LOCATION Renaissance Hotel PROJECT BACKGROUND 673 bedrooms, foyer area and the entire external windows approximately 7500 liner meters.
| Tagged Bathroom sealant, Expansion joints, External mastic joints, Glass sealant, internal mastic sealant, Kitchen sealant, Mastic Bead, Structural Sealant, Wall joints, WC sealantPROJECT LOCATION TA Colbourne Portsmouth PROJECT BACKGROUND We carried out the external sealant work required to the concrete panelling.
| Tagged concrete sealant, Expansion joints, External mastic joints, External sealant, Structural SealantPROJECT LOCATION Kingston upon Thames PROJECT BACKGROUND We were contracted to install sealant all movement joints in the new block paving.
| Tagged concrete sealant, Expansion joints, External mastic joints, Structural SealantPROJECT LOCATION Heathrow Terminal 2, London MAIN CONTRACTOR HETco PROJECT BACKGROUND This project involved carrying out the internal sealant works on the £2.5b...
| Tagged Ceiling joints, Expansion joints, Fire Rated Sealant, Frame sealant, Glass sealant, internal mastic sealant, Mastic Bead, Structural Sealant, Wall joints, WC sealantPROJECT LOCATION Stanley Barracks, Bovington, Dorset PROJECT BACKGROUND This project was to cut out and reseal the internal and external floor joints of...
| Tagged Cut Out and Re-seal, Expansion joints, External mastic joints, Floor joint sealant, Structural SealantPROJECT LOCATION Basildon, Hertford and Harlow MAIN CONTRACTOR Barratt Homes PROJECT BACKGROUND We have ongoing projects with Barratt Homes. We carried out all...
| Tagged Bathroom sealant, Ceiling joints, External mastic joints, Fire Rated Sealant, Floor joint sealant, internal mastic sealant, Kitchen sealant, Mastic Bead, Structural Sealant, WC sealant